Lightway Technology Development Limited
|
Price: | 0.8 USD |
Payment Terms: | T/T,L/C,D/A,D/P,WU,Paypal,Money Gram |
Special Groups: |
Monocrystalline Solar cells (2)
|
Place of Origin: | Guangdong, China (Mainland) |
Add to My Favorites | |
HiSupplier Escrow |
6'' Mono-crystalline 3BB M1 20.6% efficiency solar cell
Characteristics
Dimensions: 156mm x 156mm±0.5mm
Thickness(Si): 180μm±20μm/200μm±20μm
Front: Three 1.5mm wide bus bars (sliver) with distance 52mm
Blue/Purple silicon nitride AR coating
Back: 2.6mm wide sliver/aluminum soldering pads
Full aluminum local back surface field
Specifications
1. High conversion efficiency
2. Superior quality-A/A- Grade,PID-Free
3. Lowest price
4. Certificate:CE,ROHS,IEC,TUV,UL etc
5. Prompt delivery
Electrical Performance
Eff Code | 1990 | 2000 | 2010 | 2020 | 2030 | 2040 | 2050 | 2060 |
Efficiency (%) | 19.9 | 20.0 | 20.1 | 20.2 | 20.3 | 20.4 | 20.5 | 20.6 |
Pmax(W) | 4.76 | 4.78 | 4.80 | 4.83 | 4.85 | 4.88 | 4.90 | 4.92 |
Voc(V) | 0.652 | 0.653 | 0.654 | 0.655 | 0.656 | 0.657 | 0.658 | 0.659 |
Isc(A) | 9.34 | 9.37 | 9.38 | 9.39 | 9.40 | 9.41 | 9.42 | 9.43 |
Vmp(V) | 0.544 | 0.545 | 0.547 | 0.548 | 0.549 | 0.550 | 0.552 | 0.553 |
Imp(A) | 8.76 | 8.79 | 8.81 | 8.82 | 8.84 | 8.86 | 8.88 | 8.90 |
Features
1.High conversion efficiency
2.Improved red response
3.Advanced passivation technology
4.Discontinued finger for front side,island BB for rear side
5.Excellent solder-ability and adhesion strength
6.Low breakage rate
7.Vacuum package to avoid oxidation
8.Three bus bars to reduce series resistance and improve module power
Production and Quality Control
1.PID free
2.Both efficiency and Impp sorting to enhance module output power
3.Average cell efficiency is 20.0%;module efficiency>16.5%;module power(Wp)>270W(6x10)
4.100% in-line inspection of optical,Irev(>2.0A@-10v,<2.5a@-12v) and="" rsh="">10 ohm)
5.Long term efficiency stability and excellent reliability
6.REACH-SVHC test passed,ISO9001,ISO14001 and OHSAS 18001 etc certificated
Packaging & Delivery
Solar cells are packed into container with good quality,which protects them from damage during the transportation,every 100 cells are sealed by Shrinkable Film or vacuum package.
Delivery Lead Time:within 1-3 working days
1. Shipment mode:DHL/FedEx/UPS/TNT etc express ways door to door service,By air
2. Payment term:Western Union,T/T in advance etc
3. Delivery time:within 1-3 working days
4. After Sales service:replacement will be guaranteed at the first time once you got defective products